Story perspectives
Northrop Grumman's Cygnus XL Delayed by Engine Failures
9/17/2025
45 3
1 of 1
Story summary
- Northrop Grumman's Cygnus XL cargo ship, carrying over 11,000 pounds for the ISS, experienced engine shutdowns on September 16, delaying its arrival.
- NASA reported premature stops of the main engine during two orbit-raising burns.
- Flight controllers are assessing the situation and creating an alternate burn plan.
- Launched on September 14 from Cape Canaveral via a SpaceX Falcon 9, this mission is the first for the upgraded Cygnus XL, which carries 33% more cargo.
- NASA astronaut Jonny Kim must now wait for a new arrival date to capture the Cygnus with the Canadarm2.
