Story perspectives
River Lea Rerouted for Luton Town Stadium by 2028
9/20/2025
31 7
1 of 1
Story summary
- The River Lea has been rerouted for the construction of Luton Town Football Club's new stadium at Power Court, scheduled to open in 2028.
- Over 300 meters of concrete tunnel have redirected the river, which previously flowed through the pitch area.
- The original river route was blocked, creating a riverside leisure area for residents and supporters.
- Michael Moran from 2020 Developments highlighted collaboration with the Environment Agency for this project.
- Upcoming construction phases include piling, starting later this year, with visible structure development expected by summer 2026.
