Story perspectives
BYD Unveils Game-Changing Battery Storage, Surpassing Tesla
9/25/2025
30 5
1 of 1
Story summary
- BYD launched the Haohan Battery Energy Storage System (BESS) with 14.5 MWh capacity, surpassing Tesla's Megapack 3.
- The Haohan BESS cuts land use by 30% and halves the number of battery packs.
- BYD's energy storage division was rebranded to reflect its link to the parent company.
- Project costs fall nearly 22%, levelized cost $0.014 USD/kWh; US 30%, UK 80%.
