Drooid Logo
Back to today’s briefing

Story perspectives

New Botswana Data Center to Boost AI with Solar Power

10/3/2025

35 6

1 of 1

Story summary
  • AAAS Energy (Netherlands) and ChillMine Corporation (US) signed a Memorandum of Understanding (MOU) to develop a Botswana data center campus for AI computing and hyperscalers.
  • The site at Leupane Energy Hub includes 250 MW solar and a 100 MW/400 MW BESS.
  • The Leupane Energy Hub aims to sell power on the Southern African Power Pool.