Drooid Logo
Back to today’s briefing

Story perspectives

Iberdrola to Sue REE's Corredor Over Blackout Blame

10/14/2025

28 4

1 of 1

Story summary
  • Iberdrola plans to sue Beatriz Corredor, president of Red Eléctrica de España (REE), over links between April 28 blackout in Spain and producers' failures.
  • Corredor's statements allege a photovoltaic unit identified by the press as Iberdrola's acted improperly.
  • A government report blamed both REE and producers for poor planning and non-compliance.
  • REE reported significant voltage fluctuations in the grid.
  • Urgent technical adjustments are being sought to stabilize supply.