Drooid Logo
Back to today’s briefing

Story perspectives

Beaver Island Fiber Project Set for Late 2025 Launch

10/16/2025

35 4

1 of 1

Story summary
  • On September 23, 2025, workers installed fiber conduit on Beaver Island for Merit Network's project.
  • The system will connect K-12 school and health center to a microwave tower in Upper Peninsula.
  • The project should be operational by late November or December 2025.
  • The Beaver Island Association received a grant to plan last-mile connections for 600 residents and visitors.
  • Future underwater broadband cables are planned to connect Beaver Island in 2028.