Drooid Logo
Back to today’s briefing

Story perspectives

Lisbon Funicular Crash: Safety Failures and Uncertified Cable Revealed

10/22/2025

34 7 Full Breakdown

1 of 1

Story summary
  • The preliminary report from Portugal's air and rail accident investigations bureau (GPIAAF) states the cable involved in the Glória funicular crash was not certified for public transport, and Carris maintenance failures and ineffective braking contributed to the incident.
  • All Lisbon funiculars remain closed pending safety checks.
  • The investigation identified discrepancies in maintenance records and the cable's noncompliance with safety standards.
  • A final report with recommendations is expected in 2026.