Drooid Logo
Back to today’s briefing

Story perspectives

TTC Takes Control of Finch West LRT by November 3

10/24/2025

49 9

1 of 1

Story summary
  • The Toronto Transit Commission will take operational control of the Finch West LRT (Line 6) by November 3 after a 30-day trial.
  • The Finch West LRT runs along Finch Avenue West with 18 stops and serves more than 51,000 passengers daily.
  • Construction began in 2019 and concluded last fall.
  • The TTC will determine the public launch date as it trains staff.