Story perspectives
TTC Takes Control of Finch West LRT by November 3
10/24/2025
49 9
1 of 1
Story summary
- The Toronto Transit Commission will take operational control of the Finch West LRT (Line 6) by November 3 after a 30-day trial.
- The Finch West LRT runs along Finch Avenue West with 18 stops and serves more than 51,000 passengers daily.
- Construction began in 2019 and concluded last fall.
- The TTC will determine the public launch date as it trains staff.
