Drooid Logo
Back to today’s briefing

Story perspectives

Oshtemo Residents Rally Against Battery Storage Facility

10/31/2025

40 3

1 of 1

Story summary
  • Oshtemo Township residents oppose a proposed battery storage facility by NewEdge Renewable Power, citing fire hazards.
  • At the October 28 board meeting, about 50 attendees voiced safety concerns.
  • Township officials noted that a 2023 state law limits local control over such projects, and Comstock Township faces similar challenges.
  • Township Supervisor Cheri Bell and attorney James Porter criticized the legislation for undermining community authority.