Drooid Logo
Back to today’s briefing

Story perspectives

First Solar Expands with New 3.7 GW CdTe Factory

11/2/2025

30 7

1 of 1

Story summary
  • First Solar is expanding by constructing a 3.7-gigawatt CdTe solar cell factory, despite policy challenges.
  • CdTe accounted for about 30% of the utility-scale solar market in 2022 and offers durability advantages.
  • First Solar aims for 28% conversion efficiency for CdTe by 2030.
  • The Department of Energy supports CdTe through the Cadmium Telluride Accelerator Consortium to lower costs and boost efficiency.