Story perspectives
First Solar Expands with New 3.7 GW CdTe Factory
11/2/2025
30 7
1 of 1
Story summary
- First Solar is expanding by constructing a 3.7-gigawatt CdTe solar cell factory, despite policy challenges.
- CdTe accounted for about 30% of the utility-scale solar market in 2022 and offers durability advantages.
- First Solar aims for 28% conversion efficiency for CdTe by 2030.
- The Department of Energy supports CdTe through the Cadmium Telluride Accelerator Consortium to lower costs and boost efficiency.
