Story perspectives
Hybrid-Quantum Tech Cuts Manufacturing Time from Hours to Seconds
11/7/2025
1 of 1
Story summary
- D-Wave Quantum and BASF completed a proof-of-concept using hybrid-quantum technology to boost manufacturing efficiency at a BASF liquid-filling facility.
- The project reduced production scheduling time from 10 hours to seconds.
- The project reduced lateness by 14%.
- The project decreased setup times by 9%.
- D-Wave Quantum's CEO emphasized that hybrid-quantum technology delivers faster decisions and better outcomes than traditional methods, signaling a milestone for hybrid-quantum applications in production systems.
