Drooid Logo
Back to today’s briefing

Story perspectives

Shenzhen Relocates Landfill to Boost Tech Development

12/7/2025

50 9

1 of 1

Story summary
  • Shenzhen relocates a landfill from its city center to address land scarcity.
  • The project costs 2.17 billion yuan (US$307 million) and aims to detoxify 2.55 million cubic meters of waste.
  • It will free 30 hectares (74 acres) for AI servers, biotech labs, and design studios.
  • Shenzhen has 18 million people and GDP of 3.68 trillion yuan (US$520.6 billion) with a landfill that operated 1983–1997 and is a hazard.