Full Breakdown
Barbican Centre to Undergo Major Renovation, Closing for a Year
12/12/2025, 8:21:07 AM
Planned Closure and Renovation Details
The Barbican Centre in London will close for a year starting in June 2028 to undergo a significant multimillion-pound renovation aimed at securing its future. The renovation is scheduled to coincide with the venue's 50th anniversary in 2032. While the Beech Street cinemas will remain operational, the theatre, music venue, conservatory, and visual arts galleries will be shuttered during this period. The conservatory is set to close even earlier, in 2027, due to safety concerns, including falling glass.
Philippa Simpson, the director of buildings and renewal at the Barbican, emphasized the necessity of the renovation, stating that the work could not be conducted safely while the venue is open to the public. The renovation will involve major updates, including replacing electrical systems and safely removing asbestos, which will render the building unsafe for public access. Additionally, the project aims to reduce the Barbican's carbon footprint by 40%.
Impact on Arts Organizations and Staff
The closure will significantly affect resident organizations, including the London Symphony Orchestra (LSO) and the Royal Shakespeare Company, which will need to find alternative venues for their performances. The LSO's managing director, Dame Kathryn McDowell, confirmed that the orchestra is committed to providing a 2028-29 season across London and the UK, with its St Luke’s venue remaining open during the Barbican's closure.
The renovation raises concerns for the approximately 400 staff members at the Barbican, as the organization has not ruled out redundancies. Simpson noted that discussions with unions are ongoing, and the Barbican aims to handle the situation transparently and carefully. GMB senior organizer Lisa Bangs expressed support for the refurbishment while advocating for the retention of both casual and permanent staff during the renovation.
Leadership Changes and Historical Context
The Barbican has recently seen a series of leadership changes, with Abigail Pogson appointed as the new chief executive to oversee the renovation project. This marks the first major renewal effort in the Barbican's history, which has been described as having "deteriorated significantly" over the years. The first phase of the renovation is estimated to cost £231 million, with the total project budget projected at £451 million.
Opened in 1982, the Barbican has evolved from serving the 4,000 residents of surrounding flats to becoming one of the UK's most popular cultural attractions, drawing over 1.5 million visitors annually. The upcoming renovation is viewed as essential for the institution's longevity and relevance in the cultural landscape.
Official Statements & Responses
Philippa Simpson stated, “If we want it for another 50, then you’ve got to rip the plaster off and do it now and let it thrive for the next 50 and not just limp along.” She also reassured that the Barbican would maintain a presence in London during the closure, emphasizing the importance of ongoing engagement with the community.
Criticism & Opposition
While the renovation has been welcomed by some, concerns about job security for staff have been raised. The GMB union has committed to advocating for the protection of jobs throughout the renovation process, highlighting the need for careful planning and consultation with employees.
Verbatim Quotes
- “If we want it for another 50, then you’ve got to rip the plaster off and do it now and let it thrive for the next 50 and not just limp along,” — Philippa Simpson, Director of Buildings and Renewal at the Barbican.
- “She said: “We want to ensure that staff are retained and protected during these works and we will always advocate strongly for our members.” — Lisa Bangs, GMB Senior Organizer.
