Drooid Logo
Back to today’s briefing

Story perspectives

New Recycling Facility Aims to Cut Construction Waste

12/24/2025

50 12 Full Breakdown

1 of 1

Story summary
  • On December 24, 2025, Rami Rosen, Director General of the Environmental Protection Ministry, inaugurated a construction-waste recycling facility in Kedumim.
  • The facility is funded with New Israeli Shekels (NIS) 5.6 million ($1.76 million).
  • It aims to reduce landfill waste by promoting reuse of materials in construction.
  • Rosen expressed hope for the bill's passage in the Knesset.