Drooid Logo
Back to today’s briefing

Story perspectives

Chubu Electric's Restart Review Paused Amid Seismic Data Tampering

1/14/2026

40 5 Full Breakdown

1 of 1

Story summary
  • The Nuclear Regulation Authority ordered a detailed report and paused Chubu Electric Power's restart review after tampering with seismic data at Hamaoka.
  • NRA chairman Shinsuke Yamanaka said the situation is serious and the restart could be rejected.
  • Chubu Electric Power has until March 31 to report findings on the misconduct.
  • Prime Minister Sanae Takaichi supports nuclear restarts to boost energy security, noting the restart could save about 260 billion yen annually.