Drooid Logo
Back to today’s briefing

Story perspectives

Storm Damage Disrupts Train Services; Bus Replacements Implemented

1/30/2026

50 10 Full Breakdown

1 of 2

Story summary
  • Network Rail said ballast washed away on the Barnstaple and Okehampton lines, and underwater inspections of bridges and viaducts are required before services resume.
  • Great Western Railway (GWR) managing director Mark Hopwood says storm damage has affected infrastructure, with branch lines submerged and water levels must fall.
  • Bus replacements will run Par to Newquay and Liskeard to Looe, but poor road conditions block Exeter St Davids to Barnstaple/Okehampton route.
1 / 2