1 of 1
Story summary
- The expert panel's report attributes the Spain-Portugal blackout to a "perfect storm" of factors.
- The report notes the outage lasted up to 10 hours.
- The report cites concerns about Spain's renewable reliance and the planned nuclear phaseout.
- Damian Cortinas, president of ENTSO-E (European Network of Transmission System Operators for Electricity), stated Iberia's inability to manage overvoltage events was a key factor.
- The report criticizes grid operators for inadequate real-time monitoring.
