1 of 1
Story summary
- On April 9, 2026, a technical fault in the interconnection between Hong Kong's power providers caused a brief voltage dip, triggering about 90 lift entrapments on Hong Kong Island.
- Fire Services Department confirmed entrapments occurred between 9:23 AM and 9:53 AM.
- Hong Kong Electric Company Limited (HK Electric) attributed the dip to a fault in interconnection with CLP Power.
- HK Electric did not provide a timeline for full restoration.
