Story perspectives
LA Opens Wilshire Subway, Halving Downtown-Beverly Travel
5/8/2026
1 of 1
Story summary
- After 65 years of battles, Los Angeles opened the first Wilshire subway segment on Friday.
- The D Line extension adds three underground stations along Wilshire, spans 3.92 miles and cost $9.7 billion, funded largely by a 2008 half-cent sales tax.
- Construction faced tar-like soils, methane and fossil finds near the La Brea Tar Pits, requiring special tunneling.
- Officials say the line will cut downtown-to-Beverly Hills trips from 45 to about 20 minutes, easing parking pressure.
