Story perspectives
NZTA Eyes New Auckland Harbour Bridge or Tunnel by 2026
5/13/2026
1 of 1
Story summary
- NZ Transport Agency is reviewing options for a second Auckland harbour crossing because the existing bridge exceeded its design load and costs over $25 million annually, with a decision expected by mid-2026.
- Mayor Wayne Brown called proposal a “bridge of fools,” saying it would worsen traffic bottlenecks.
- Transport Minister Chris Bishop said the choice will be a new bridge or a tunnel, with the NZTA board to consider proposals next month.
