Drooid Logo
Back to today’s briefing

Story perspectives

NZTA Eyes New Auckland Harbour Bridge or Tunnel by 2026

5/13/2026

50 3 Full Breakdown

1 of 1

Story summary
  • NZ Transport Agency is reviewing options for a second Auckland harbour crossing because the existing bridge exceeded its design load and costs over $25 million annually, with a decision expected by mid-2026.
  • Mayor Wayne Brown called proposal a “bridge of fools,” saying it would worsen traffic bottlenecks.
  • Transport Minister Chris Bishop said the choice will be a new bridge or a tunnel, with the NZTA board to consider proposals next month.