Drooid Logo
Back to today’s briefing

Story perspectives

Tata, ASML to Build $11B Dholera Chip Fab by 2026

5/18/2026

37 8 Full Breakdown

1 of 3

Tata-ASML Build
  • On May 16 2026, Tata Electronics and ASML signed a memorandum of understanding to build an $11 billion semiconductor fab in Dholera, Gujarat.
  • Prime Minister Narendra Modi and Prime Minister Rob Jetten witnessed the signing.
  • ASML will supply lithography machines, train talent and help create a supply chain for the Dholera fab.
  • The fab is slated to produce automotive, mobile and AI chips with output expected by late 2026.
1 / 3