Drooid Logo
Back to today’s briefing

Story perspectives

UAE Pipeline 50% Complete, Doubling Capacity After Hormuz Closure

5/21/2026

29 2 Full Breakdown

1 of 4

Al Jaber Expands Pipeline
  • UAE’s West-East crude pipeline is about 50 % complete, ADNOC chief executive Sultan Al Jaber said.
  • The line will double capacity through Fujairah and augment the Abu Dhabi Crude Oil Pipeline (ADCOP), which moves up to 1.8 million barrels daily.
  • The project accelerated after Iran closed the Strait of Hormuz following U.S.–Israeli strikes on February 28, spiking oil prices.
  • Al Jaber warned oil flows may need four months to reach 80 % of normal levels.
1 / 4