Drooid Logo
Back to today’s briefing

Story perspectives

BHP Pauses Pilbara Renewable Projects, Extends Diesel Use

5/26/2026

50 12 Full Breakdown

1 of 3

**BHP Halts Renewables**
  • BHP halted its Pilbara solar-farm and battery project.
  • The 50-MW Jimblebar solar farm, its 20-MW battery and a near-500-MW solar-wind-battery scheme all lack funding and will not progress before 2031.
  • BHP cancelled an iron-ore plant that would have cut 1.7 million tonnes of emissions annually.
  • May 2025 memos said renewable urgency had faded.
  • BHP spent $500 million on diesel trucks for Jimblebar, extending diesel use into the late 2030s.
1 / 3