Story perspectives
Europe’s Grid Bottlenecks Trap €100B Renewable Investments
6/2/2026
1 of 1
Story summary
- Over €100 billion of renewable investments are trapped in Europe’s distribution grids, with DSOs backlogging 375 GW of renewables and 455 GW of battery storage.
- The European Commission’s 2025 Grids Package pledges €1.2 trillion investment by 2040 and eight “energy highways,” yet campaigners say it ignores distribution bottlenecks.
- In Germany, Spain and Britain, limited grid capacity has postponed rooftop solar, heat-pump rollouts and battery projects that exceed double their 2030 targets, raising curtailment concerns.
