Story perspectives
GAO Flags $11.5M Waste, 3 Deaths Prompt Shutdown Call
6/11/2026
1 of 2
Story summary
- GAO report found the $1.3 billion contract spent $11.5 million on guards, medical care and meals before any detainees arrived.
- Rep. Veronica Escobar called for the facility’s shutdown and a contractor investigation.
- The Army rushed the Fort Bliss center to finish in 2025 for President Donald Trump’s deportation plan, hiring a low-cost contractor with no detention-facility experience.
- Harsh conditions at the 5,000-person site have been reported, with three detainee deaths confirmed.
1 / 2
