Drooid Logo
Back to today’s briefing

Story perspectives

Montana Drafts Big Hole River Impairment, Drying Threat Looms

6/26/2026

34 2 Full Breakdown

1 of 1

Story summary
  • Montana DEQ issued a draft eutrophication impairment for the Big Hole River; final decision not due until 2027, and the river now flows at about one-quarter of normal volume, risking dry conditions within weeks.
  • Andy Ulven said listing could formalize issue and allow Loads for nitrogen, phosphorus and temperature; Trout Unlimited may receive funding for restoration, and a lawsuit over House Bill 664 could force nutrient standards by 2027.