Drooid Logo
Back to today’s briefing

Story perspectives

Meta invests $9.1B in Alberta AI data center.

7/10/2026

46 10 Full Breakdown

1 of 3

Meta Builds AI
  • Meta will invest US$9.1 billion to build its first AI data center in Sturgeon County, Alberta.
  • The center will be Meta’s largest outside the United States.
  • It will draw power from the 932-megawatt Greenlight Electricity Center, a natural-gas plant built by a consortium including Pembina Pipeline Ltd.
  • Meta will allocate US$42 million for local roads and water infrastructure while using a closed-loop cooling system that does not draw water from local sources.
1 / 3