Drooid Logo
Back to today’s briefing

Story perspectives

Lincoln Reflecting Pool Drained Again, Vandals Charged, $16M Repairs

7/18/2026

33 2 Full Breakdown

1 of 2

Story summary
  • The Lincoln Memorial Reflecting Pool was drained a second time in mid-July for repairs, with refill later.
  • Costs have risen from $1.5 million to $16 million, with Atlantic Industrial Coatings and Green Water Solutions as primary contractors.
  • Four individuals, including Olympic canoeist David Hearn, were charged with damaging the liner and pleaded not-guilty.
  • President Donald Trump said vandals cut a 300-yard gash in the liner, but photos have not confirmed it.
1 / 2