Drooid Logo
Back to today’s briefing

Story perspectives

Hungary Faces 2,000 MW Plant Shutdown, Orders Evening Power Cuts

8/1/2026

44 6 Full Breakdown

1 of 2

Story summary
  • Prime Minister Péter Magyar warned the Paks Nuclear Power Plant could shut down in 24–72 hours because Danube water falls low.
  • Below 50 % capacity, a shutdown would cut about 2,000 megawatts, or 25-30 % of generation.
  • It ordered 5 p.m.–10 p.m. electricity cuts for households and industry and announced 4 GW wind, 3 GW storage, an HUF 868 billion investment and a EUR 1.5 billion grid upgrade.
  • Commission spokesperson Anna-Kaisa Itkonen said Commission is ready to convene an Electricity Coordination Group meeting.
1 / 2