Drooid Logo
Back to today’s briefing

Story perspectives

Auckland City Rail Link Set for September 2026 Opening

8/6/2026

27 3 Full Breakdown

1 of 2

Story summary
  • Minister Chris Bishop and Mayor Wayne Brown announced the City Rail Link opens on September 13, 2026.
  • $5.4 billion project adds a twin-tunnel, two stations—Te Waihorotiu and Karanga-a-Hape—and upgrades at Waitemata and Maungawhau.
  • Auckland Transport said trains will run every five minutes downtown and ten minutes elsewhere, causing a 7.9 % rate rise to fund council’s 50/50 share.
  • A billboard posted the opening date early, mistakenly listing Friday, which Bishop called “ironic.”
1 / 2