Drooid Logo
Back to today’s briefing

Story perspectives

Greenlink Cable Rerouted to Safeguard Bronze Age Urn

8/10/2026

50 4 Full Breakdown

1 of 3

Simon Ludlam Reroutes
  • Simon Ludlam rerouted the Greenlink cable at Freshwater beach after fans called to object to a Dobby memorial.
  • The diversion kept the line away from a Bronze Age collared urn dated c. 1700-1500 BC.
  • The 500 MW bidirectional interconnector, commissioned in 2025, links Ireland and the United Kingdom.
  • Directional drilling beneath the beach and dunes avoided open-cut trenching, prompting the National Trust to warn visitors not to leave items on the coast.
1 / 3