Drooid Logo
Back to today’s briefing

Story perspectives

Greenlink reroutes $580 million line after Dobby protest

8/16/2026

23 3 Full Breakdown

1 of 1

Story summary
  • Project manager Simon Ludlam rerouted the $580 million Greenlink interconnector away from the fictional Dobby memorial on Freshwater West beach, Pembrokeshire.
  • Hundreds of fans protesting after a 2022 National Trust request left socks at the site, prompting the route change.
  • The revised line now passes near Bronze Age burial urns while preserving Dobby’s grave.
  • Fans have marked the beach with stones inscribed “Here lies Dobby. A free elf.”