Story perspectives
Reopened Haywards Heath–Lewes Line Set for September 1
8/21/2026
1 of 2
Story summary
- Network Rail and Southern Railway UK will reopen the Haywards Heath–Lewes line on 1 September.
- A derailment occurred Thursday 13 August at 3:54 pm near Lewes when a Victoria-Eastbourne service left the tracks.
- Thirty passengers were injured, two seriously, and twenty required hospital treatment.
- Crews used specialist Kirow cranes and temporary foundations to lift three overturned carriages.
- Engineers will replace track, repair the embankment, reinstate signalling and conduct safety tests before reopening.
1 / 2
