Drooid Logo
Back to today’s briefing

Story perspectives

Reopened Haywards Heath–Lewes Line Set for September 1

8/21/2026

49 10 Full Breakdown

1 of 2

Story summary
  • Network Rail and Southern Railway UK will reopen the Haywards Heath–Lewes line on 1 September.
  • A derailment occurred Thursday 13 August at 3:54 pm near Lewes when a Victoria-Eastbourne service left the tracks.
  • Thirty passengers were injured, two seriously, and twenty required hospital treatment.
  • Crews used specialist Kirow cranes and temporary foundations to lift three overturned carriages.
  • Engineers will replace track, repair the embankment, reinstate signalling and conduct safety tests before reopening.
1 / 2