Drooid Logo
Back to today’s briefing

Story perspectives

NTA to Run Driverless Metro Trains Every 1.5 Minutes

8/25/2026

26 2 Full Breakdown

1 of 1

Story summary
  • NTA announced driverless Gush Dan metro trains will run every 1.5 minutes.
  • The system will eliminate about 1,000 metro drivers and save NIS 150 million annually.
  • Each tender consortium must include an Israeli cyber-security firm alongside foreign partners.
  • NTA will tender the M1 line from Sharon to Rehovot.
  • NTA will also tender a combined package for M2 (Holon-Petah Tikva) and M3 (Herzliya-Ben-Gurion Airport).