Story perspectives
Energy Minister Says Sorek A Resumes Amid Algae Crisis
9/7/2026
1 of 2
Cohen Resumes Sorek
- Energy Minister Eli Cohen announced that the Sorek A desalination plant resumed operation amid the algae-induced water crisis.
- Five of Israel's six desalination plants shut down after a micro-algae bloom from Egypt's Nile Delta clouded intake water.
- Palmachim and Sorek B run at half capacity to avoid clogging filtration systems.
- The Water Authority sprayed copper sulfate from a plane over a nine-kilometre stretch to combat algae.
1 / 2
