Drooid Logo
Back to today’s briefing

Story perspectives

Energy Minister Says Sorek A Resumes Amid Algae Crisis

9/7/2026

13 2 Full Breakdown

1 of 2

Cohen Resumes Sorek
  • Energy Minister Eli Cohen announced that the Sorek A desalination plant resumed operation amid the algae-induced water crisis.
  • Five of Israel's six desalination plants shut down after a micro-algae bloom from Egypt's Nile Delta clouded intake water.
  • Palmachim and Sorek B run at half capacity to avoid clogging filtration systems.
  • The Water Authority sprayed copper sulfate from a plane over a nine-kilometre stretch to combat algae.
1 / 2