1 of 4
Panama Canal Cuts
- The Panama Canal Authority began cutting ship transits on September 4, 2026 because low water levels from an El Niño-driven drought forced the change.
- A postponement was announced for the scheduled reduction in maximum draft for Neopanamax vessels.
- Daily ship limits were lowered from 36 to 32 vessels, with the lower figure to take effect by mid-September.
- Gatun Lake water stood near 84 feet, with a 0.4-foot rise expected in October before a decline.
1 / 4
