Drooid Logo
Back to today’s briefing

Story perspectives

Kyushu Shinkansen Reopens After 52-Day Quake Shutdown

By Drooid · · How we work

1 1 Full Breakdown

1 of 1

Story summary
  • JR Kyushu reopened the Kumamoto–Shin-Minamata section of the Kyushu Shinkansen on Friday.
  • All Hakata to Kagoshima-Chuo stations resumed service 52 days after the July 28 magnitude-7 quake.
  • Trains will travel at a reduced 70 kph over a roughly 10-km stretch near Shin-Yatsushiro.
  • JR Kyushu will cut Kagoshima-Chuo to Sanyo Shinkansen trains by 10%.
  • Travel time between Kumamoto and Kagoshima-Chuo will increase by eight minutes, shifting departures earlier by up to nine minutes.