Drooid Logo
Back to today’s briefing

Story perspectives

PLC completes 1,896m drill at Rochefort gold prospect

By Drooid · · How we work

1 1 Full Breakdown

1 of 1

Story summary
  • PLC Resources completed an eight-hole, 1,896-metre drill at Rochefort gold prospect, WA.
  • The drill intersected sheared, sulphide-bearing zones in fractionated dolerite, matching its sulphidation model.
  • Samples sent to lab; gold assay results due in four to six weeks.
  • Airborne magnetic survey found a 14-km fold structure on the eastern margin of the Abbotts Belt.
  • PLC will do geological reconnaissance next month before a maiden regional air-core drill on untested targets.