1 of 1
Story summary
- PLC Resources completed an eight-hole, 1,896-metre drill at Rochefort gold prospect, WA.
- The drill intersected sheared, sulphide-bearing zones in fractionated dolerite, matching its sulphidation model.
- Samples sent to lab; gold assay results due in four to six weeks.
- Airborne magnetic survey found a 14-km fold structure on the eastern margin of the Abbotts Belt.
- PLC will do geological reconnaissance next month before a maiden regional air-core drill on untested targets.
