Story perspectives
Phoenix Builds Reverse-Osmosis UV Plant to Recycle 7 Million Daily
By Drooid · · How we work
1 of 1
Story summary
- Phoenix is building a reverse-osmosis UV plant that will recycle 7 million gallons daily.
- Federal cuts will halve Central Arizona Project flow next year, slashing Phoenix’s Colorado River supply.
- Lake Mead sits at less than 27% capacity, with the bathtub-ring 175 ft above level.
- Colorado River flow dropped 20% since 2000, leaving Hoover and Glen Canyon reservoirs at historic lows.
- Las Vegas built a $1.3 bn, 200-ft-deep intake to keep drawing water.
