Drooid Logo
Back to today’s briefing

Story perspectives

NHSRCL Completes 480-Metre Sabarmati Bridge for Bullet Train

By Drooid · · How we work

23 4 Full Breakdown

1 of 1

Story summary
  • NHSRCL completed a 480-metre, 36-metre-high bridge over the Sabarmati River for the Mumbai-Ahmedabad bullet train.
  • The bridge rises about 36 metres, comparable to a 12-storey building.
  • It uses eight circular piers, four of which are set in the riverbed.
  • Construction employed the balanced cantilever method, allowing segment erection without conventional scaffolding.
  • Gujarat has built 18 of the 21 river bridges planned for the corridor.