1 of 1
Story summary
- Augustus Minerals restarted drilling at its Music Well gold project in Western Australia.
- After heavy rains, the rig finished a reverse-circulation hole at Clifton East before moving to St Patrick’s Well.
- Drilling at Clifton East was turned 180° to test northwest-directed veins under a new geological model.
- Surface samples at St Patrick’s Well showed 30.4 g/t gold, with additional hits of 21.7 g/t and 20.4 g/t.
