Drooid Logo
Back to today’s briefing

Story perspectives

Augustus Minerals Hits Up to 30.4 g/t at St Patrick’s

By Drooid · · How we work

10 2 Full Breakdown

1 of 1

Story summary
  • Augustus Minerals restarted drilling at its Music Well gold project in Western Australia.
  • After heavy rains, the rig finished a reverse-circulation hole at Clifton East before moving to St Patrick’s Well.
  • Drilling at Clifton East was turned 180° to test northwest-directed veins under a new geological model.
  • Surface samples at St Patrick’s Well showed 30.4 g/t gold, with additional hits of 21.7 g/t and 20.4 g/t.