Drooid Logo
Back to today’s briefing

Story perspectives

PMG Tops Out Waldorf Astoria Miami With 90% Deposits

9/2/2026

34 3 Full Breakdown

1 of 1

Story summary
  • Property Markets Group (PMG) is building the 1,049-foot Waldorf Astoria Miami condo-hotel.
  • Construction reached the 85th floor by Aug. 31 2026, with topping-off slated for fall.
  • PMG has secured deposits on 90% of the 387 condo units, showing strong demand.
  • Condo prices start at $3.15 million, with the top-floor penthouse listed at $50 million.