1 of 1
Story summary
- Broken Hill Gold launched a geophysics program and added a second drill rig at White Dam.
- The program includes 48 km of IP and 670 km of magnetics surveys due mid-October.
- Icebreaker drilling returned 20 m at 2.5 g/t gold and 0.5 % copper from 58 m.
- Later work intersected 46 m at 1.1 g/t gold and 0.3 % copper from 37 m.
