Drooid Logo
Back to today’s briefing

Story perspectives

Aurum hits high-grade gold, boosting Côte d’Ivoire resources

By Drooid · · How we work

11 3 Full Breakdown

1 of 1

Story summary
  • Aurum Resources struck high-grade gold outside its Boundiali project in Côte d’Ivoire.
  • A 2.38-m intercept graded 22.01 g/t gold, including a 1-m core at 51.38 g/t at BMT2.
  • BMT1 produced a 1.35-m intercept of 43.32 g/t gold and a 1-m zone of 47.56 g/t.
  • Aurum’s resource increased to 4.4 million ounces of gold.
  • A June prefeasibility study projected an 11-year mine life yielding 1.5 million ounces.